Business20TrafficStudy.com
Home | Public Forum 1 (Jan-05) | Public Forum 2 (May-05) | Public Forum 3 (June-05) | Final Report

BUSINESS 20 TRAFFIC STUDY OPEN HOUSE HANDOUTS

June 21, 2005 at 7:00 PM

TxDOT TO HOLD BUSINESS 20 TRAFFIC STUDY OPEN HOUSE

The TxDOT Odessa District, with the assistance of Lee Engineering, LLC, is performing a study of traffic operations and safety along the Business IH 20 (BI 20) corridor from 8th Street in the City of Odessa to Midkiff Road in the City of Midland.  The purpose of this study is to identify short-term and long-term improvements to address the operational and safety issues which currently exist along the BI 20 corridor.

TxDOT is holding a public forum to discuss this study and the BI 20 corridor.  At this third and final of three public forums, Lee Engineering, TxDOT Odessa District’s consultant in charge of the project, will present proposed short-term and long-term recommendations to improve safety and operations along the corridor.   These recommendations include modified access to businesses along the BI 20 corridor, and changes to median opening locations.  After the presentation, representatives from TxDOT and Lee Engineering will be available for discussion.

The open house will be held on:

Tuesday, June 21, 2005 at 7:00 PM

Airport Plaza Inn
Lone Star Meeting Room
3312 South County Road 1276
Midland, TX 79711
(432) 561-8000

Comments should be directed via email to: b20study@lee-eng.com

The following files were part of the presentation materials for the Business 20 Traffic Study presented at the second Public Meeting for the project on June 21, 2005. 

General Corridor Handouts


Public Forum Presentation

 Print(.pdf) < 900 kb

Section Specific Handouts  

SECTION 1 - 8th Street to West of JBS Parkway

Section 1.1
 View (.pdf) <500 kb
     
 

SECTION 2 - JBS Parkway to West of Loop 338


Section 2.1
 View (.pdf) <500 kb
     
 
SECTION 3 - Loop 338 to West of FM 588 / Faudree

Section 3.1
 View (.pdf) <500 kb

Section 3.2
 View (.pdf) <500 kb

Section 3.3
 View (.pdf) <500 kb
 
 
SECTION 4 - FM 588 / Faudree to West of Coors

Section 4.1
 View (.pdf) <500 kb

Section 4.2
 View (.pdf) <500 kb

Section 4.3
 View (.pdf) <500 kb

Section 4.4
 View (.pdf) <500 kb
 
SECTION 5 -Coors to West of Loop 250

Section 5.1
 View (.pdf) <500 kb

Section 5.2
 View (.pdf) <500 kb

Section 5.3
 View (.pdf) <500 kb

Section 5.4
 View (.pdf) <500 kb

Section 5.5
 View (.pdf) <500 kb

Section 5.6
 View (.pdf) <500 kb

Section 5.7
 View (.pdf) <500 kb

Section 5.8
 View (.pdf) <500 kb
       
SECTION 6 - Loop 250 to West of Eisenhower

Section 6.1
 View (.pdf) <500 kb
     
 
SECTION 7 - Eisenhower to West of Thomason

Section 7.1
 View (.pdf) <500 kb

Section 7.2
 View (.pdf) <500 kb
   
 
SECTION 8 - Thomason to Midkiff Rd.

Section 8.1
 View (.pdf) <500 kb
     

Information presented in the first public meeting, January 19, 2005, can be found on this page - Public Forum 1

Information presented in the second public meeting, May 3, 2005, can be found on this page - Public Forum 2


           

TxDOT Odessa | City of Midland | City of Odessa | Lee Engineering