Business20TrafficStudy.com
Home | Public Forum 1 (Jan-05) | Public Forum 2 (May-05) | Public Forum 3 (June-05) | Final Report

BUSINESS 20 TRAFFIC STUDY OPEN HOUSE HANDOUTS

MAY 3, 2005 PUBLIC MEETING #2

The TxDOT Odessa District, with the assistance of Lee Engineering, LLC, is performing a study of traffic operations and safety along the Business IH 20 (BI 20) corridor from 8th Street in the City of Odessa to Midkiff Road in the City of Midland.  The purpose of this study is to identify short-term and long-term improvements to address the operational and safety issues which currently exist along the BI 20 corridor. 

TxDOT held a public forum to discuss this study and the BI 20 corridor.  At this second public forum, Lee Engineering, TxDOT Odessa District’s consultant in charge of the project, presented and summarized proposed short-term and long-term improvements to the corridor.   

Comments should be directed via email to: b20study@lee-eng.com

The following files were part of the presentation materials for the Business 20 Traffic Study presented at the second Public Meeting for the project on May 3, 2005. 

General Corridor Handouts


Public Forum Presentation

 Print(.pdf)

Section Specific Handouts  

SECTION 1 - 8th Street to West of JBS Parkway

Section 1.1
 View (.pdf) <135 kb
     
 

SECTION 2 - JBS Parkway to West of Loop 338


Section 2.1
 View (.pdf) <150 kb
     
 
SECTION 3 - Loop 338 to West of FM 588 / Faudree

Section 3.1
 View (.pdf) <180 kb

Section 3.2
 View (.pdf) <170 kb

Section 3.3
 View (.pdf) <155 kb
 
 
SECTION 4 - FM 588 / Faudree to West of Coors

Section 4.1
 View (.pdf) <175 kb

Section 4.2
 View (.pdf) <150 kb

Section 4.3
 View (.pdf) <150 kb

Section 4.4
 View (.pdf) <115 kb
 
SECTION 5 -Coors to West of Loop 250

Section 5.1
 View (.pdf) <150 kb

Section 5.2
 View (.pdf) <135 kb

Section 5.3
 View (.pdf) <135 kb

Section 5.4
 View (.pdf) <135 kb

Section 5.5
 View (.pdf) <155 kb

Section 5.6
 View (.pdf) <155 kb

Section 5.7
 View (.pdf) <155 kb

Section 5.8
 View (.pdf) <135 kb
       
SECTION 6 - Loop 250 to West of Eisenhower

Section 6.1
 View (.pdf) <165 kb
     
 
SECTION 7 - Eisenhower to West of Thomason

Section 7.1
 View (.pdf) <155 kb

Section 7.2
 View (.pdf) <145 kb
   
 
SECTION 8 - Thomason to Midkiff Rd.

Section 8.1
 View (.pdf) <105 kb
     

Information presented in the first public meeting, January 19, 2005, can be found on this page - Public Forum 1

Information presented in the final public meeting, June 21, 2005, can be found on this page - Public Forum 3


           

TxDOT Odessa | City of Midland | City of Odessa | Lee Engineering